project outline:

endress+hauser

credit card manufacturer

swiss major bank

puma switzerland

johnson + johnson cb1, cb2

neode

peugeot

hightech-company

johnson + johnson cb3

holiday village côte d'azur

quark

stryker spine

coop-cc+cd

eta fontainemelon

kyphon

lemo-hu

vaucher manufacture fleurier sa

stryker osteosynthesis

lemo (uk) ltd.

coop-ca

 

more missions

salon: atelier de beauté
consultancy:
hotel:
historical:

 

search for:

overview of the building

client: stryker osteosynthesis
built volume: 14'000 m3
gross floor surface: 6'600 m2

situation

because of the successful project process of stryker spine's new building in la chaux-de-fonds (Switzerland), stryker osteosynthesis too came up to mühlemann + partner for the design of a new building's project. The site is situated east of the village centre, directly at the main road connecting grenchen and solothurn. up to now this land was used for agricultural purposes.

the client's aim is to realise a representative building, in which administration, an auditorium for presentations and training as well as operation theatres and production rooms are arranged. in addition to this the independent division of stryker-swiss sales organisation should be positioned in this building.

solution

inspired by the open field a project was developed that reminds in its airiness of a butterfly, which is alighting on a bloom. the butterfly's lightness is carried on in the detailed architecture.

the glazed administration wing in a v-form is connected with the production wing by a joint. the cafeteria and the auditorium for presentations and training are located in this joint. storage and arrival are contained in the production wing.

high attention was payed to the administration building's interior design. a glazed floor allows a view on the operation theatres and the cafeteria, which is in the basement. this transparency visualises the company's philosophy on the one hand and on the other hand permits the use of natural light. to screen from view horizontal blinds can be attached if so needed.

all areas can be extended: the administration wing by a lateral elongation as well as by the realisation of an additional storey. the production surfaces can be axially tripled. A central axis keeps the different parts of the building together. it serves as main transport axis for persons, material and building services. this is shown to the exterior by the roof system, which contains the whole building services' distribution. the suspensions, distinctively, as well as delicately seeming, enable the realisation of production rooms, with a span width of 30 m, completely clear of any pillars. by this the flexibility of the company organisation is enhanced. Without any alteration efforts all operating procedures can be adapted to new conditions at any time.

the access to the administration wing's main entrance will be completely designed – like the whole surroundings. a big pond in front of the main entrance and an extensive planting around the building with a small wood in the east arrange for a beautiful transition to the neighbouring areas. the extremely high visibility of the big building complex at the village's access road was consciously made use of to realise an image shaping construction for both the community and the company.

the building complex' appearence was deliberately held in a similar style like the one in la chaux-de-fonds. this above all considering the choice of materials and the location of the building services' distribution. the fix sun screen in the west was designed likewise for functional reasons on the one hand and on the other hand for reasons of recognition. in spite of this affinity the building develops an independent character by its alignment on various utilisations.

 