project outline:

endress+hauser

credit card manufacturer

swiss major bank

puma switzerland

johnson + johnson cb1 + cb2

neode

peugeot

hightech-company

johnson + johnson cb3

holiday village côte d'azur

quark

stryker spine

coop-cc+cd

eta fontainemelon

kyphon

lemo-hu

vaucher manufacture fleurier sa

stryker osteosynthesis

lemo (uk) ltd.

coop-ca

 

more missions

salon: atelier de beauté
consultancy:
hotel:
historical:

 

search for:

a brief description of the building

client: petroplus refining cressier sa, switzerland
volume: 4'122 m3
total floor area: 710 m2

situation

a new control centre must be realized on the petrol refining site in cressier. the technical conception was been created by amec, an engineering company from london specialised in this kind of refining installations.
beside of control and surveillances installations, the project must include a cafeteria and relaxing rooms for the employees (24-hours-per-day-occupation). next to the main building a garage for the internal fire brigade had to be previewed.
regarding the technical requirements the buildings must resist at an eventual blast accident on site and be completely proof against eventual smoke or toxic clouds coming from outside.

solution

m+p tried to integrate the different needs in a global solution. it means, the equipment layouts and all technical requirements had to be respected. In that way a project created by its function became developed.
a screen made of reinforced concrete will protect controlling and surveillance installations from eventual blast. that is the reason why this screen just has openings for access and visual controls. at the same time all different functions are concentrated behind.
the floor plan is based on a design frame which allows optimal and economical room divisions inside.
the north elevation, at the back of blast danger, is almost completely glazed or created as a metallic structure (as the only elevation). the fire brigade garage is designed on the same base.
the roofs are naturally green (sedum) for ecological, economical and qualitative reasons. this is the standard of projects by m+p.