project outline:

endress+hauser

credit card manufacturer

swiss major bank

puma switzerland

johnson + johnson cb1, cb2

neode

peugeot

hightech-company

johnson + johnson cb3

holiday village côte d'azur

quark

stryker spine

coop-cc+cd

eta fontainemelon

kyphon

lemo-hu

vaucher manufacture fleurier sa

stryker osteosynthesis

lemo (uk) ltd.

coop-ca

 

more missions

salon: atelier de beauté
consultancy:
hotel:
historical:

 

search for:

overview of the building

client: Lemo (UK) ltd.
built volume: 15'000 m3
gross floor surface: 4'000 m2

situation

in worthing (12 miles away from brighton) lemo wants to errect a new building. the company had designed a project by a local architect. this did not satisfy the swiss holding company by two reasons: the already planned project proved to be too expensive on the one hand and on the other hand as not functional enough. as Mühlemann + partner had already successfully designed a project for a production and administrative building in budapest, lemo assigned the same team to present an optimized project.

the demands on the building's concept are quite complex. besides space for administration, research and development, assembling and distribution had to be situated. in doing so there had to be considered that for research and development separate rooms from lemo (uk) ltd. are available.

the site is situated in worthing's centre, between the historical part and the commercial zone and therefore in a sensitive environment. the project was to be integrated into the existing traffic conception because of the access – especially in the delivery area.

solution

the project's architecture consciously picks up existing elements of the neighbourhood. an elegant building was developed, which uses elements that are already existing in the surrounding area with its curved, geometrical forms (coast line, piers, art deco buildings). with its brick elevation towards the historical centre it features the dominant vernacular materials and colours. nevertheless the construction shows a contemporary, lightly seeming and detailed architecture, which fits very delicately in these sensitive surroundings. an open glazed façade generates transparency towards the road. with this harmonically appearing structure a visual tranquillity is achieved. fixed fins work as optimal sun screens and allow for the local weather conditions with frequent gales, which can cause damage to sun blinds. at the same time these constructions set architectural accents.

the volume was integrated in a way that neighboured buildings still get a maximum of sun light. at the same time the available ground is used in an optimal and therewith economical way. because of the clever arrangement there is enough space to allow a sophisticated landscaping. green roofs advance the water retention. a sufficient amount of parking spaces can be located on the site. accessing and leaving the area for visitors and delivery is in accordance with the local traffic conception.

lemo (uk) ltd. as well as the research and development division have separate entrances to the building and separate secondary rooms for litter, toilets etc. There is the benefit of synergies in central lifts for goods, personal lifts and stairs, which simultaneously serve both parties.

as usual Mühlemann + Partner looked after highest flexibility in the design of the production and assembly rooms. surfaces are clear of other utilisations like toilets, lifts, stairs, ducts etc. because there aren't any pillars in the rooms every adaptation to new needs and operating procedures is possible any time. further more an optimal load capacity of the floors was taken into consideration right from the start. therewith every new use is imaginable in the future. all building services, like watertank for sprinkler, rooms for air conditioning, heating and ventilation, are centrally located in the basement. vertical ducts provide the whole building.

already integrated in the conception is a future extension of one storey, wherewith the client can react on additional needs, once the community has raised - as planned – the maximal building's height in this zone.

together with a maximal flexibility the building's conception achieves the objection of minimal running costs, in using low-maintenance materials. nevertheless the building meets the requirements of showing a representative appearance.